Sale
| Color / Pattern |
|
| Power Source |
|
| Communication Protocols |
|
| Controller Design |
|
Configured for power connection and multi-input/output management in Mark V turbine control systems, the GE DS200PCCAG6ACB (DS200PCCAG6ACB Drive Board) provides direct physical/electrical execution.
| Suffix Segment | Parameter Designation | Description & Configuration |
|---|---|---|
| DS200 | Series Tag | Mark V Series assembly and domestic original manufacture location |
| PCCA | Functional Acronym | Power Connect Card assembly |
| G6 | Product Grouping | Group six revision iteration |
| A | Major Design Revision | Initial primary hardware layout version |
| C | Functional Revision | Secondary circuit update level |
| B | Artwork Revision | Board trace routing and layout version |
| Parameter | Specification |
|---|---|
| Model | DS200PCCAG6ACB |
| Brand | GE General Electric |
| Series | Mark V Turbine Control |
| Origin | USA / Global Manufacturing Facility |
| Weight | 0.31 kg (0.68 lbs) |
| Dimensions | Standard Mark V PCB form factor |
| Operating Temp | 0 deg C to +65 deg C |
| Power Consumption | System-dependent internal logic load |
| Memory Capacity | Integrated on-board RAM for signal processing |
| I/O Capability | Multi-input / multi-output signal routing |
The board utilizes high-velocity backplane communication paths to interface seamlessly with Mark V turbine control architecture. Profinet and EtherNet/IP deterministic network integration capabilities ensure real-time telemetry processing across multi-input and multi-output channels. I/O density scaling and on-board RAM data caching maintain execution stability during dynamic operational cycles, while firmware flash compatibility permits structured software upgrades across system controller nodes.
Q: What is the primary function of the DS200PCCAG6ACB card within the Mark V system?
A: It functions as a power connection and multi-input/output board, handling signal routing, power distribution, and on-board data caching via integrated RAM.
Q: Does the board require any custom configuration jumpers during replacement?
A: Yes. Hardware jumpers and configuration settings must be matched exactly to the replaced board revision layout prior to system startup.
Q: Can this drive board be replaced while the turbine control cabinet is powered on?
A: No. All power sources to the rack must be shut down and verified using a meter to prevent electrical shock and backplane damage.

Quick dispatch from our global inventory to reduce downtime and ensure uninterrupted operations.
All parts are sourced from reputable manufacturers and undergo thorough quality checks.
Extensive stock of industrial automation and discontinued parts, ready for immediate shipment.
Every product — including obsolete items — is covered by a 12-month warranty and 30-day return guarantee.
All product names, trademarks, brands, and logos mentioned on this website are the property of their respective owners.These names and trademarks are used for identification and reference purposes only.We are an independent supplier of industrial automation spare parts.We are not an authorized distributor, dealer, or representative of any manufacturer.Products supplied may include surplus inventory or unused items.We do not claim any affiliation with or endorsement by the original manufacturers.